Apex Water completed the upgrade of Meremere wastewater treatment plant for Watercare in the Waikato District. To improve effluent quality and cater for future growth, the facility was expanded with a modular and containerised membrane bioreactor (MBR) treatment plant designed and constructed by Apex, alongside upgrades to ancillary processes. The existing plant was transformed from a low level of mechanisation into a futureproof, autonomous treatment process.
The project involved considerable enabling works to reclaim parts of the existing oxidation pond. Apex managed these works directly while developing the mechanical design, allowing efficient delivery of the entire project within 12 months. Apex also directed the electrical, control and automation upgrades, enabling design changes and scope additions to be implemented efficiently through a single workgroup.
This approach delivered the project on schedule while providing the Principal with flexibility to adapt the design to evolving requirements. The reliability and performance of the new process supported the granting of a new 35-year discharge consent.

Check out our other Projects
We've designed and built many great projects, which is a testament to the high standards that we adhere to when we do business.


-1.jpg)